Asphalt Work

  • Remove existing asphalt by mill grinding process to a depth of 2" (approximately 10,000 s.f.)
  • Remove existing asphalt by mill grinding process to a depth of 4" (approximately 4,000 s.f.)
  • Re-grade and compact existing base
  • Lay new asphalt and roll to compaction
  • Re-strip where necessary

 Installation of new catch drain

  • Dig trench to connect new catch drain to existing drain
  • Install schedule 8 piping (approximately 100')
  • Install new stone base - regrade and compact
  • Lay new asphalt and roll to compaction

  Concrete Work

  • Removal of flatwork concrete (approximately 120 s.f.)
  • Install new gravel - grade and recompact
  • REpin concrete 18" on center with rebar
  • Install 6 by 6 wire mesh
  • Replace broken drain pipe
  • Install quantity 4 commericial floor drain (4" diamter)
  • Pour and from 5" thick concrete (3000 PSI) - trowel and broom finish
  • Repair and replacement of misc concrete curbs and sidewalks
  •  
 